Yesterday, a group of us got to take a tour of the construction site here at CMS/CSI. The workers have been working furiously since January, tearing down buildings, digging holes, making piles of dirt, filling in holes, and pouring concrete. The building modules are starting to arrive and soon they will be installed in their places. Here are some pictures:
Here is a view of a form they have built. They will fill this with concrete to create a low wall/sitting area.
This is what the low wall / sitting area will look like.
These forms will be filled with concrete to form the foundation for the modular buildings.
These are the first of the modules to be delivered. It will take 10 of these to make one building. There will be 5 new buildings.
This foundation is ready for its modules.
This is going to be a lovely planter with trees and flowers that will separate the lower playground from the upper.
I'm looking forward to seeing the final results. I'm very excited about the new school and I'm happy that I get to be a part of it.